MHD Advanced Power Train Phase I, Final Report, Volume 6

By A. R. Jones

Abstract

Under contract to the Department of Energy, Westinghouse has prepared the definition of a program plan for the development of an MHD Advanced Power Train (APT). The scope of work of this contract includes conceptual designs of early commercial MHD/steam electric plants (topping/bottoming) ranging from 200 to 1000 Mw(e). These plant designs were prepared during 1982 and made use of a system analysis model that provides performance and design information and economic estimates. In early April 1984, DOE requested westinghouse to perform special studies under the existing APT contract to aid the Department in evaluating MHD program options. Two tasks were defined by DOE: the first task was to evaluate an 80 MW(t) integrated test system (with steam electric bottoming cycle) for installation at the CDIF in Butte, Montana; the second task was to investigate placing a 50 MW(e) MHD topping stage onto an existing steam electric plant (as a retrofit). This volume of the final report documents the results of these special studies. Highlights of the studies were presented orally to DOE on May 15, 1984

Topics: Economics, 33 Advanced Propulsion Systems, Performance, Bottoming Cycles, Steam, Design
Publisher: Westinghouse Advanced Energy Systems
Year: 1985
DOI identifier: 10.2172/1015967
OAI identifier:
Provided by: UNT Digital Library
Download PDF:
Sorry, we are unable to provide the full text but you may find it at the following location(s):
  • http://digital.library.unt.edu... (external link)
  • Suggested articles


    To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.