Article thumbnail

The Effectiveness of Three Heuristic Rules for Job Sequencing in a Single Production Facility

By R. D. Haynes, C. A. Komar and Jr. Jack Byrd

Abstract

This paper examines the effectiveness of three heuristic rules used in production sequencing where the objective is to minimize the downtime due to setup changes. The effectiveness of these heuristic rules was evaluated under various conditions of job size and setup time distribution. The results of this analysis indicate that job conditions do affect the effectiveness of these three rules.

DOI identifier: 10.1287/mnsc.19.5.575
OAI identifier:
Download PDF:
Sorry, we are unable to provide the full text but you may find it at the following location(s):
  • http://dx.doi.org/10.1287/mnsc... (external link)

  • To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.

    Suggested articles