The Effectiveness of Three Heuristic Rules for Job Sequencing in a Single Production Facility

Abstract

This paper examines the effectiveness of three heuristic rules used in production sequencing where the objective is to minimize the downtime due to setup changes. The effectiveness of these heuristic rules was evaluated under various conditions of job size and setup time distribution. The results of this analysis indicate that job conditions do affect the effectiveness of these three rules.

Similar works

Full text

thumbnail-image

Research Papers in Economics

Provided original full text link
Last time updated on 7/6/2012

This paper was published in Research Papers in Economics.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.