Due-Dates and Instantaneous Load in the One-Machine Shop

Abstract

The due-date assignment problem occurs when due-dates are assigned within, rather than outside, a job shop. This study explores the importance of instantaneous and future shop loads in setting due-dates in shops operating under due-date dependent queue discipline. The assignment of due-dates to arriving jobs in an m-machine shop is formulated as a stochastic dynamic programming problem in the first part of this study. A computational experiment using dynamic programming is performed in the second part and due-dates are developed for specific instantaneous load conditions in a simulated one-machine shop. The importance of instantaneous and future shop loads for assigning due-dates in a one-machine shop, with constant interarrivals and exponential service times, is shown.

Similar works

Full text

thumbnail-image

Research Papers in Economics

Provided original full text link
Last time updated on 7/6/2012

This paper was published in Research Papers in Economics.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.