Abstract

Electricity transmission pricing and transmission grid expansion have received increasing regulatory and analytical attention in recent years. Since electricity transmission is a very special service with unusual characteristics, such as loop flows, the approaches have been largely tailor-made and not simply taken from the general economic literature or from the more specific but still general incentive regulation literature. An exception has been Vogelsang (2001), who postulated transmission cost and demand functions with fairly general properties and then adapted known regulatory adjustment processes to the electricity transmission problem. A concern with this approach has been that the properties of transmission cost and demand functions are little known but are suspected to differ from conventional functional forms. The assumed cost and demand properties in Vogelsang (2001) may actually not hold for transmission companies (Transcos). Loop-flows imply that certain investments in transmission upgrades cause negative network effects on other transmission links, so that capacity is multidimensional. Total network capacity might even decrease due to the addition of new capacity in certain transmission links. The transmission capacity cost function can be discontinuous. There are two disparate approaches to transmission investment: one employs the theory based on long-run financial rights (LTFTR) to transmission (merchant approach), while the other is based on the incentive-regulation hypothesis (regulatory approach). An independent system operator (ISO) could handle the actual dispatch and operational pricing. The transmission firm is regulated through benchmark or price regulation to provide long-term investment incentives while avoiding congestion. In this paper we consider the elements that could combine the merchant and regulatory approaches in a setting with price-taking electricity generators and loads.Electricity transmission, Incentive regulation, Financial transmission rights, Loop-flow problem

OAI identifier:

Suggested articles

Preview

Citations

  1. (2006). A Merchant Mechanism for Electricity Transmission Expansion.
  2. (2000). Alternative Models for Congestion Management and Pricing Impact on Network planning and Physical Operation,” CIGRE,
  3. (2000). An Empirical Model of the Impact of Hedge Contract on Bidding Behavior in a Competitive Electricity
  4. (2007). An Incentive Mechanism for Electricity Transmission Expansion
  5. (2003). and London Economics International (2003),”A Proposed Methodology for Evaluating the Economic Benefits of Transmission Expansions in a Restructured Wholesale Electricty Market,” mimeo,
  6. (2002). Confirmed Pricing Methodology. Final Design Principles.
  7. (1992). Contract Networks for Electric Power Transmission,”
  8. (2006). Electricity Transmission Pricing and Performance-based Regulation,”
  9. (2005). Electricity Transmission: An Overview of the Current Debate,"
  10. (2002). Financial Transmission Right Formulations,” Mimeo,
  11. (2002). Financial Transmission Right Incentives: Applications Beyond Hedging.” Presentation to HEPG Twenty-Eight Plenary Sessions,
  12. (2000). Flowgate Rights and Wrongs”, Mimeo,
  13. (1997). Improving Private Incentives for Electric Grid
  14. (2000). Marginal Pricing of Transmission Services: A Comparative Analysis of Network Cost Allocation Methods,”
  15. (2001). Methodology for Analyzing Transmission Upgrades: Two Alternative Proposals,” Mimeo.
  16. (1982). On the Nonlinear Pricing
  17. (1999). Options for Electricity Transmission Regulation in
  18. (2000). PBR Designs for Transcos: Towards a Comparative Framework,
  19. (2001). Price Regulation for Independent Transmission Companies,”
  20. (2002). Pricing Natural Gas Distribution in
  21. (1988). Regulating Without Cost Information: The Incremental Surplus Subsidy
  22. (2000). Regulation of an Electric Power Transmission
  23. (2004). Regulation of Transmission Expansion in Argentina: Part I – State Ownership, Reform and the Fourth Line.”
  24. (2002). TCC Awards for Transmission Expansions,” Mimeo.
  25. (2002). TCC Expansion Awards for Controllable Devices: Initial Discussion,” Mimeo.
  26. (2006). Transmission Investment in a Deregulated Power Market,”
  27. (2003). Transmission Regulation,
  28. (2000). Transmission Rights and Market Power on Electric Power Networks,”
  29. (2004). Transmission Rights and Transmission Expansion,”

To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.