Coordinated supply chain scheduling

Abstract

A mixed integer programming approach is proposed for a long-term, integrated scheduling of material manufacturing, material supply and product assembly in a customer driven supply chain. The supply chain consists of three distinct stages: manufacturer/supplier of product-specific materials (parts), producer where finished products are assembled according to customer orders and a set of customers who generate final demand for the products. The manufacturing stage consists of identical production lines in parallel and the producer stage is a flexible assembly line. The overall problem is how to coordinate manufacturing and supply of parts and assembly of products such that the total supply chain inventory holding cost and the production line start-up and parts shipping costs are minimized. A monolithic approach, where the manufacturing, supply and assembly schedules are determined simultaneously, is compared with a hierarchical approach. Numerical examples modeled after a real-world integrated scheduling in a customer driven supply chain in the electronics industry are presented and some computational results are reported.Supply chain scheduling Production-inventory planning Mixed integer programming

Similar works

Full text

thumbnail-image

Research Papers in Economics

Provided original full text link
Last time updated on 7/6/2012

This paper was published in Research Papers in Economics.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.