Skip to main content
Article thumbnail
Location of Repository

Technological stage of securing building hole for construction of hotel

By Martin Němec

Abstract

The object of dissertation is to present the procedure of bracing of foundation pits for construction of hotel with rider bracing. Present the reasons of design technology, equipment plan of construction site and necessary machines. Piles for rider bracing are cased with steel casting brouse of uncohesive dirt under the watter level. Diameter of piles for bracing constructions is 630 mm, length up to 8 meters

Topics: Rider bracing; vrtané piloty; ocelová pažnice; zápory; foundation pit; sheeting boards; steel casing; pažiny; stavební jáma; bored piles; Záporové pažení; rider
Publisher: Vysoké učení technické v Brně. Fakulta stavební
Year: 2012
OAI identifier: oai:invenio.nusl.cz:249185
Download PDF:
Sorry, we are unable to provide the full text but you may find it at the following location(s):
  • http://www.nusl.cz/ntk/nusl-24... (external link)
  • Suggested articles


    To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.