Location of Repository

Warming and Starting Nuclear Unit up of the Dukovany NPP after the Outage

By Lubomír Ludvík

Abstract

This thesis deals with the analysis of warming and starting up the nuclear unit of Dukovany NPP after the outage. First part explains the various operating modes of nuclear power plants, specifically operating modes of Dukovany NPP. The following part contains the analysis of heat sources in the primary circuit and also the individual production and consumption of steam by the NPP. The next part deals with division into several points of the warming of the Dukovany NPP. The analysis of warming nuclear unit after a outage is made on the basis of the industry based data, measured in December 2015. The result of the analysis is determination the amount of steam passing from a another nuclear unit, which is following by the own proposal of the external steam source

Topics: warming of the nuclear unit; analýza; Jaderná elektrárna Dukovany; externí zdroj páry; spouštění; Nuclear power plant Dukovany; analysis; náhřev bloku; starting up; external steam source
Publisher: Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií
Year: 2016
OAI identifier: oai:invenio.nusl.cz:242192
Download PDF:
Sorry, we are unable to provide the full text but you may find it at the following location(s):
  • http://www.nusl.cz/ntk/nusl-24... (external link)
  • Suggested articles


    To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.