Skip to main content
Article thumbnail
Location of Repository

Selected Parts of the Construction Technology Project of Reinforced Concrete Bridge in Mostkovice

By Miroslav Procházka

Abstract

This thesis deals with selected Parts of the construction technology project of reinforced concrete bridge in Mostkovice. It is about a replacement of the existing masonry construction of new, reinforced-concrete frame founded on surface. Part of the work in addition to other are schedule and financial plan, budget and construction situation, site equipment, study of realization, plan of using the main mechanisms, health and safety at work and technological prescription

Topics: most Mostkovice; plan of using the main mechanisms; rozpočet; plán nasazení hlavních mechanismů; BOZP; financial plan; Bridge Mostkovice; situace stavby; construction situation; health and safety at work; time schedule; časový plán; site equipment; zařízení staveniště; technologický předpis; technological prescription; technical report; technická zpráva; studie realizace; budget; finanční plán; study of realization
Publisher: Vysoké učení technické v Brně. Fakulta stavební
Year: 2013
OAI identifier: oai:invenio.nusl.cz:226101
Download PDF:
Sorry, we are unable to provide the full text but you may find it at the following location(s):
  • http://www.nusl.cz/ntk/nusl-22... (external link)
  • Suggested articles


    To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.