The ODA TC pilot project "Small scale irrigation using collector wells - Zimbabwe" began
in October 1992. This report outlines progress made on all aspects during the fourth six
months of work.
The six project schemes are now complete. Two additional schemes for Plan International
(NGO) are also near to completion. As planned, these schemes represent a range of physical,
social, economic and institutional settings. The number of families obtaining domestic water
from 011k-funded schemes is 1319 and the number of families with allotments on the
community gardens is approximately 577.
Individual socio-economic baseline surveys have been carried out for the six project
communities and now provide data on social, institutional, economic and agricultural aspects
of rural life before scheme installation. This information is being used in monitoring and
evaluating the impacts of the schemes on the communities and in drawing up guidelines for
the design and implementation of future schemes. Shortage of water is the principal problem
reported by respondents at all sites. At some, the priority is for a cleaner and more reliable
source of domestic water. At others, the priority is for water to allow vegetables to be grown
for home consumption and for sale.
Monitoring of garden performance is proceeding well. The first scheme completed in Chivi
District in 1991 continues to produce high returns, recording an average gross margin of
Z19,900perhaperyearforthreeyearsofoperation.Firstgrossmarginsrecordedatpilotprojectschemesaresimilarlyhigh,beingZ18,204 and Z$25,444 at Muzondidya and Gokota
respectively. The figure for Gokota actually represents less than one complete year and is an
indication of the excellent returns possible from small areas intensively cultivated if water can
be made available in these dry areas. Social and institutional "teething" problems were
encountered at most of the earlier schemes. However, production figures indicate that these
have been overcome. Valuable lessons have also been learnt by project staff that led to
significant improvements in implementation of the later schemes.
Good progress has been made on the comparison of well design at each scheme location.
Total water use from the collector wells is typically 15-20 cubic metres per day.
Improvement to yield by radial drilling has been very good at four of the five sites drilled to
date, and both pump tests and well performance suggest that the wells at Dekeza, Nemauka
and Mawadze could in fact now support a garden larger than 0.5ha if required. First results
comparing performance of the collector wells with other well types at each scheme location
indicate that single high yielding boreholes may be technically viable in some areas.
However, real comparison can only be made when pump tests are completed during a period
of drought. Economic viability of siting high yielding boreholes to support community
gardens is also shown to depend very much on the success rate of drilling.
Excellent progress has been made to distil experiences and knowledge gained during this pilot
phase and to draft guidelines to assist future development of community gardens using
groundwater. A decision tree is being developed that shows key steps now known to be
important to achieve successful collaboration with communities and to help ensure
implementation of schemes more likely to be sustainable from a social point of view. This
also includes the key steps required to determine the most cost-effective well design to
support a community garden in any area.
Indicative values of agroeconomic performance of different types of irrigation system
operating in Southern Zimbabwe highlight the important role that community gardens using
groundwater can play, addressing in particular the primary needs of improved health and
poverty alleviation in poor rural communities in dry areas. Indeed, much interest is being
expressed by various organisations in the region wishing to develop these type of schemes.
It is timely, therefore, for discussion amongst senior GoZ staff and ODA to determine how
best to proceed from this pilot phase and to develop groundwater based community gardens
on a wider scale