oaioai:edpsciences.org:dkey/10.1051/epjconf/20123100031

R3B time projection chamber

Abstract

Within the international FAIR project, the R3B collaboration (Reaction studies with Radioactive Relativistic beams) will be in charge of the physics program with secondary beams of energy between 200 and 1500MeV per nucleon. Central to the R3B set-up will be a large-aperture superconducting magnet under construction at CEA-Saclay. An international collaboration has been formed to work on the design of a large time-projection chamber (TPC) to be installed behind this magnet to cover the full phase-space of the charged fragments produced in the target. Within this collaboration, tests of detector prototypes were performed with the heavy-ions beams at GSI Darmstadt. These prototypes were equipped with a gaseous Micromegas detector. Two amplification technologies were tested, either conventional or resistive Micromegas and two construction concepts, bulk-Micromegas or micro-meshes screwed on the PCB. We will present the results of the last beam and the 1m TPC station which will be dedicated to make tests using the real drift distance and compare the performances of micromegas and GEM

Similar works

Full text

thumbnail-image

EDP Sciences OAI-PMH repository (1.2.0)

Provided original full text link
oaioai:edpsciences.org:dkey/10.1051/epjconf/20123100031Last time updated on 4/10/2020

This paper was published in EDP Sciences OAI-PMH repository (1.2.0).

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.