Redesain dan Perkuatan Struktur Abutmen Beton Bertulang Jembatan Sumara

Abstract

Bridge is one of the most important transportation infrastructures that joining two side of highway thus the bridge is highly needed. To design a bridge geotechnical and hydrological data is crucial as well as characteristic of the river. In the case if a bridge were designed without acurately determine the 50 year return period of flood, then the bridge possibly  are not save against real flood that may occur. Thus the abutment has to be redesign and retrofitted. Redesign is important to fullfill requirement of high of free space superstructure if the maximum flood occur. Redesign conducted by adding 1,6 m high of the abutment. Controlling stabilities of the abutment i.e: shear and overturning were done. Retrofitting was applied by adding longitudinal and transversal reinforcement with the same dimension and space especially at the joint of transversal reinforcement, transversal reinforcement space reduced to half of its normal space. Longitudinal reinforcement applied was D19-150 and the transversal reinforcement was ᴓ12-100. To connect the fresh concrete and existing concrete applied material were epoxy resin based produced by PT. SIKA Nusa Pratama SIKADUR®732

Similar works

This paper was published in JOURNAL TEKNIK SIPIL DAN INFRASTRUKTUR.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.