NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION

By Mr. Gary and Van Middlesworth

Abstract

documents the inspection results, which were discussed at the end of the on-site activities on September 29, 2006, with Mr. J. Bjorseth and other members of your staff. A re-exit meeting was held by telephone at the conclusion of the inspection on November 15, 2006, with S. Catron. The inspection examined activities conducted under your license as they relate to safety and to compliance with the Commission’s rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. As a result of your intent to adopt the National Fire Protection Association Standard (NFPA) 805 code, “Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, ” as defined by Title 10, Code of Federal Regulations (CFR), Part 50, Section 48(c), the inspection was conducted in accordance with Inspection Procedure 71111.05TTP, “Fire Protection- NFPA 805 Transition Period (Triennial), ” dated May 9, 2006. The inspection examined activities conducted under your license, as they relate to safety and to compliance with the Commission’s rules and regulations, and with the conditions of you

Year: 2006
OAI identifier: oai:CiteSeerX.psu:10.1.1.186.1990
Provided by: CiteSeerX
Download PDF:
Sorry, we are unable to provide the full text but you may find it at the following location(s):
  • http://citeseerx.ist.psu.edu/v... (external link)
  • http://adamswebsearch.nrc.gov/... (external link)
  • Suggested articles


    To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.