Location of Repository

Internals

By 

Abstract

01.01 To determine whether the technical requirements detailed or referenced in Chapters 1, 3, 5, 6 and 17 of the facility SAR associated with reactor vessel and internals have been adequately addressed in the construction specifications, drawings, and work procedures and whether the established system of management controls is adequate. 01.02 To determine whether quality assurance plans, instructions, and procedures for the reactor vessel and internals have been established in the facility QA Manual and implementing procedures and whether these documents conform with the QA program described in Chapter 17 of the facility SAR. 01.03 To determine whether specification or procedural controls associated with the reactor vessel and internals are adequate and determine whether any potentially generic problems or other weaknesses exist within the preparing technical organization

Year: 2011
OAI identifier: oai:CiteSeerX.psu:10.1.1.186.1266
Provided by: CiteSeerX
Download PDF:
Sorry, we are unable to provide the full text but you may find it at the following location(s):
  • http://citeseerx.ist.psu.edu/v... (external link)
  • http://adamswebsearch2.nrc.gov... (external link)
  • Suggested articles


    To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.