Skip to main content
Article thumbnail
Location of Repository

Timing Budgeting under Arbitrary Process Variations ∗

By Ruiming Chen and Hai Zhou

Abstract

Timing budgeting under process variations is an important step in a statistical optimization flow. We propose a novel formulation of the problem where budgets are statistical instead of deterministic as in existing works. This new formulation considers the changes of both the means and variances of delays, and thus can reduce the timing violation introduced by ignoring the changes of variances. We transform the problem to a linear programming problem using a robust optimization technique. Our approach can be used in late-stage design where the detailed distribution information is known, and is most useful in early-stage design since our approach does not assume specific underlying distributions. In addition, with the help of block-level timing budgeting, our approach can reduce the timing pessimism. Our approach is applied to the leakage power minimization problem. The results demonstrate that our approach can reduce timing violation from 690ps to 0ps, and the worst total leakage power by 17.50 % on average.

Year: 2008
OAI identifier: oai:CiteSeerX.psu:10.1.1.134.2925
Provided by: CiteSeerX
Download PDF:
Sorry, we are unable to provide the full text but you may find it at the following location(s):
  • http://citeseerx.ist.psu.edu/v... (external link)
  • http://www.ece.northwestern.ed... (external link)
  • Suggested articles


    To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.