Article thumbnail

The evaluation of road maintenance programs, case study: the national road maintenance programs in West Sumatra

By Yuniar Haptiwi Tri, Adji Bayu Martanto and Hidayat Benny

Abstract

Currently, due to the limitation of funding, the national road maintenance programs in West Sumatra which were based on the output from IIRMS (Indonesian Integrated Road Management System) cannot be fully implemented. In order the road maintenance can be carried out effectively according to parameters considered, the ranking of roads priority must be determined. In this study, analyzes were conducted in the determination of national road maintenance priorities. The parameters used are SDI, IRI, road width, and V / C ratio. The methods used were the AHP (Analytical Hierarchy Process), IPA (Importance Performance Index) modification, and CSI (Customer Satisfaction Index) modification. In the study also evaluated the effectiveness of road maintenance program which was made by Satker P2JN, BPJN III compared to the result of the analysis. The result shows that there was still ineffectiveness of road maintenance programs made by BPJN III

Topics: Engineering (General). Civil engineering (General), TA1-2040
Publisher: EDP Sciences
Year: 2018
DOI identifier: 10.1051/matecconf/201822903016
OAI identifier: oai:doaj.org/article:9cf0e342f343496ea95a6a59917b4758
Journal:
Download PDF:
Sorry, we are unable to provide the full text but you may find it at the following location(s):
  • https://doaj.org/toc/2261-236X (external link)
  • https://doaj.org/article/9cf0e... (external link)
  • https://doi.org/10.1051/matecc... (external link)
  • Suggested articles


    To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.