Location of Repository

Construction virtual prototyping : a survey of use

By Ting Huang, Heng Li, Hongling Guo, Neo Chan, Stephen Kong and Martin Skitmore

Abstract

Purpose –The introduction of Building Information Model tools over the last 20 years is resulting in radical changes in the Architectural, Engineering and Construction industry. One of these changes concerns the use of Virtual Prototyping - an advanced technology integrating BIM with realistic graphical simulations. Construction Virtual Prototyping (CVP) has now been developed and implemented on ten real construction projects in Hong Kong in the past three years. This paper reports on a survey aimed at establishing the effects of adopting this new technology and obtaining recommendations for future development.\ud \ud Design/methodology/approach – A questionnaire survey was conducted in 2007 of 28 key participants involved in four major Hong Kong construction projects – these projects being chosen because the CVP approach was used in more than one stage in each project. In addition, several interviews were conducted with the project manager, planning manager and project engineer of an individual project. \ud \ud Findings –All the respondents and interviewees gave a positive response to the CVP approach, with the most useful software functions considered to be those relating to visualisation and communication. The CVP approach was thought to improve the collaboration efficiency of the main contractor and sub-contractors by approximately 30 percent, and with a concomitant 30 to 50 percent reduction in meeting time. The most important benefits of CPV in the construction planning stage are the improved accuracy of process planning and shorter planning times, while improved fieldwork instruction and reducing rework occur in the construction implementation stage. Although project teams are hesitant to attribute the use of CVP directly to any specific time savings, it was also acknowledged that the workload of project planners is decreased. Suggestions for further development of the approach include incorporation of automatic scheduling and advanced assembly study.\ud \ud Originality/value –Whilst the research, development and implementation of CVP is relatively new in the construction industry, it is clear from the applications and feedback to date that the approach provides considerable added value to the organisation and management of construction projects. \u

Topics: 120201 Building Construction Management and Project Planning, Construction planning, Communication, Process simulation, Virtual prototyping
Publisher: Emerald Group Publishing Limited
Year: 2009
DOI identifier: 10.1108/14714170910995958
OAI identifier: oai:eprints.qut.edu.au:29463

Suggested articles

Preview

Citations

  1. (2001). 4D CAD – an efficient tool to improve the production method for integration of apartments into existing buildings,
  2. (2005). 4D dynamic construction management and visualization software: 1.
  3. (2003). A survey of virtual prototyping techniques for mechanical product development.
  4. Alarcon, L.(2001) 4D planning and scheduling (4D-PS): grounding construction IT research in industry practice.
  5. (1995). An analysis of the impacts of using three dimensional computer models in the management of construction. Construction Industry Institute.
  6. (2005). BIM pays off in productivity. AEC From the Ground Up The Building Information Model.
  7. (2007). Collaboration; A Technology or human problem?,
  8. (2007). Combining 3D models with simulations to meet the building design and urban planning challenges of the 21st century.
  9. (2003). Development of an integrated information resource base for 4D/VR construction processes simulation.
  10. (2001). Focused sharing of information for multi-disciplinary decision making by project teams.
  11. (2008). Integrating design and construction through virtual prototyping. Automation in Construction
  12. (2004). Proposal for case studies on the implementation and benefits of 3D and 4D CAD. CIFE Seed Proposal Summary Page, 2004-2005 projects,
  13. (2002). Representing Work Spaces Generically in Construction Method Models.
  14. (2005). The engineering dimension of nD modeling: performance assessment at conceptual design stage. ITcon Vol. 10, Special Issue From 3D to nD modeling,
  15. (2004). Towards virtual prototyping in the construction industry: the case study of the DIVERCITY project,
  16. (2001). Understanding the project planning process: requirements capture for the virtual construction site.
  17. (2005). Urban information model for city planning. ITcon Vol. 10, Special Issue From 3D to nD modelling ,
  18. (2007). VDC Use in 2007: Significant Use, Dramatic Growth, and Apparent Business Opportunity.
  19. (2005). Virtual design and construction: themes, case studies and implementation suggestions, CIFE Working Paper 097, CIFE,

To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.