Examining the use of bid information in predicting the contractor’s performance

By Sai On Cheung, Peter S. P. Wong, Ada Y. S. Fung and W. V. Coffey

Abstract

Purpose – The purpose of this paper is to examine the use of bid information, including both price and non-price factors in predicting the bidder’s performance. Design/methodology/approach – The practice of the industry was first reviewed. Data on bid evaluation and performance records of the successful bids were then obtained from the Hong Kong Housing Department, the largest housing provider in Hong Kong. This was followed by the development of a radial basis function (RBF) neural network based performance prediction model. Findings – It is found that public clients are more conscientious and include non-price factors in their bid evaluation equations. With the input variables used the information is available at the time of the bid and the output variable is the project performance score recorded during work in progress achieved by the successful bidder. It was found that past project performance score is the most sensitive input variable in predicting future performance. Research limitations/implications – The paper shows the inadequacy of using price alone for bid award criterion. The need for a systemic performance evaluation is also highlighted, as this information is highly instrumental for subsequent bid evaluations. The caveat for this study is that the prediction model was developed based on data obtained from one single source. Originality/value – The value of the paper is in the use of an RBF neural network as the prediction tool because it can model non-linear function. This capability avoids tedious ‘‘trial and error’’ in deciding the number of hidden layers to be used in the network model. Keywords Hong Kong, Construction industry, Neural nets, Modelling, Bid offer spreads Paper type Research pape

Topics: 120201 Building Construction Management and Project Planning, Hong Kong construction industry, Neural nets, Modelling, Bid offer spreads
Publisher: Emerald Group Publishing Ltd.
Year: 2008
DOI identifier: 10.1108/13664380810898122
OAI identifier: oai:eprints.qut.edu.au:29146

Suggested articles

Preview

Citations

  1. (1993). A Conceptual Alternative to Current Tendering Practice,
  2. (1999). A neural network based system for predicting earthmoving production.
  3. and Ee L.P.(2004). Predicting Performance of Design-Build and Design-Bid-Build Projects.
  4. (1999). Application of artificial neural network to forecast construction duration of buildings at the pre-design stage.
  5. (1996). Case-based reasoning decision support for contractor prequalification, A Thesis Submitted to the
  6. (1995). Case-based reasoning for contractor prequalification - a feasibility study,
  7. (2003). Classification of transcranial doppler signals using artificial neural network.
  8. (1999). Client and consultant perspectives of prequalification criteria.
  9. (1992). Competitiveness in Bidding: A Consultant's Perspective.
  10. (2004). Contractor selection using analytic network process.
  11. (1998). Contractor selection using multi-criteria utility theory: an additive model. Building and Environment,
  12. (1995). CP-DSS: Decision support system for contractor prequalification.
  13. (1997). Criteria for contractor selection.
  14. (1988). Decision Criteria in Contractor Prequalification,
  15. (1994). Decision support system for construction prequalification,
  16. (1999). Decision-makers' perception in the formulation of prequalification criteria.
  17. (2004). Electronic Statistics Textbook.
  18. (2000). Final contractor selection using analytical hierarchy process.
  19. (2002). Housing Authority (HKHA)
  20. (2004). How project manager can better control the performance of designbuild projects.
  21. (1988). Knowledge Engineering in a Knowledge-Based System for Contractor Prequalification, Proceedings: Microcomputer Knowledge-Based Expert Systems in Civil Engineering,
  22. (2001). Multi-criteria assessment of the probability of winning competitive bidding process.
  23. (2003). Multiple regression and neural networks analyses in composites machining.
  24. (2004). Neural network model to support international market entry decisions.
  25. (2004). NeuroSolutions user menu.
  26. (2002). Performance modeling for contractors selection.
  27. (2005). Prediction of organizational effectiveness in construction companies.
  28. (2000). Project dispute resolution satisfaction classification through neural network.
  29. (2002). Selecting the best contractor to get performance: on time, one budget, meeting quality expectations.
  30. (2002). State of Utah Performance Information Procurement System Tests.
  31. (1985). Tender Evaluation by Fuzzy Sets,
  32. (2004). Testing of Minimization of Subjectivity in Best Value Procurement by Using Artificial Intelligence Systems in State of Utah Procurement.
  33. (2004). Using neural network to predict performance of designbuild projects in Singapore. Building and Environment,
  34. (1998). Verification and validation of a case-based prequalification system,

To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.